Conclusion
The objective was a water balance the operator could test its optimisation cases against, with disposal headroom stated at real pressure. It was achieved. The balance closes by facility with the error shown, the headroom table carries a pressure and a date for every injection well, and two routing cases were withdrawn because the balance showed the disposal pumps could not take the water.
| Success criterion | Met | How it was achieved |
|---|
| iWater balance closes at each facility between separated, treated, disposed, re-injected and ponded water | Met | Balance issued by facility with the closing error shown, and refreshed weekly from the daily summaries |
| iiDisposal headroom stated at actual pressure, with the date of the pressure reading | Met | Headroom table issued with pressure, date and source for every injection well |
| iiiEvery optimisation case checked against the water route it loads | Met | Two routing cases withdrawn when the balance showed the disposal pumps could not take the water |
| ivEach water limit carries the oil that depends on it | Met | Limit-to-production table adopted in the operator's weekly capacity review |